Taneum Creek Study: The Bruton-KRD Water Exchange Project

External Document

Date published: June 2009

Authors: Monk, Patrick A.

Reference:

Monk, Patrick A. 2009. Taneum Creek Study: The Bruton-KRD Water Exchange Project. U.S. Bureau of Reclamation Final Report. June.

Abstract:

This report evaluates a proposal to provide Bruton Ditch water users with alternatives to the existing irrigation and stock water delivery system. The YRBWEP staff has studied the hydrologic, environmental, engineering, and economic aspects of the proposal while preparing this report, solicited public comments, and revised the report in response to comments.

The Bruton Ditch alternatives are intended to improve habitat conditions and fish production in Taneum Creek without adversely affecting existing water and land uses

Contact person/agency: U.S. Bureau of Reclamation

File Format: pdf

Associated Data:

Spatial Data

Download: Monk_2009.zip
  • Summary: Contains the location of the Bruton Ditch as well as the area of the lands served by it.
  • File Format: ESRI Shapefile
  • Coordinate System: WGS 1984
  • Contact: U.S. Bureau of Reclamation